Well in CDC’s opinion of the first two months of 2010 business is picking up. At least in Temecula,CA it is but I have also had some good calls from Huntington Beach, Laguna Beach. Not too much in the way of new construction mostly kitchen and bath remodels. These are fine with me the average master remodel takes me a little over 2 weeks once all the tile is in so I can get started.
I have been using the Kerdi Shower System and also the Laticrete Hydroban over mud bed lately for my showers depending on the budget for the project.
Although there is a lot of tile contractors in this city be careful and check out the work first hand anyone can show a picture. I myself have a showroom located in Andy’s Glass in Murrieta, CA a great place if you need any type of glass or windows.