Category Archives: Uncategorized

Frank and Christine’s Temecula Tumbled Master Bathroom

In the beginning of August we did a master shower project for a couple in Temecula. Unfortunately I have only got to meet Christine since her husband is serving in the military and is stationed in Afghanistan right now. Here at Chad Deiter Company we pride ourselves in taking care of the people who protect our families and us. We offer military discounts to them even though this discount does not even come close to the sacrifices that those serving and their families make.

This master had already been started by another tile guy but I think that as the design got more complicated he got in a little over his head. So being that I am a tile contractor I was contacted by Christine to come out and take a look. She asked me to give some advice to what should be done with the tile. She also had a couple pictures of the “shower of her dreams “and that’s the direction that we headed in. The pictures that she had were of a tile job using 4×4 tumbled marble and various decorative liners and trim pieces. As well as a nice 5/8” mosaic that was used in the liner of the bathroom.

Once we had settled on the design and the tiles we started putting together a digital rendering of the master so she could get a feel for what I was seeing in my head. This is often helpful and like my wife always reminds me people don’t see what I see. Once that drawing was completed I emailed it to her to get her thoughts and then make changes. The drawing stayed the same and we were off to the next big thing of picking out tile. The homeowner had been to a few places already and I sent her to a few more. But by the end of that weekend the tile was decided and ordered.

The original design was to be two different tumbled marbles in a checkerboard pattern. The design was going to be straight on the bottom half and diagonal on the top half. The two halves were separated by a nice liner using the 5/8” Mosaic and Ogee on top with a  Dome liner on the bottom. This bathroom was going to be something special I knew it from the start. Once the entire tile order had made the way to the job we put the install on the schedule and started the next week.

When I looked at the job the Hardi Backer Cement Board was already installed and even though I was told that there was paper behind it I still wanted to use  Laticrete HydroBan. For those unfamiliar with the Hydro Ban product it’s an excellent liquid membrane waterproofing that can be applied to the outside of this type of application. I also use it on my steam showers after the cement float has dried for 3 days. The next step was rolling on the waterproofing and letting that dry so the tile could be installed. I know this was overkill but also was peace of mind on my part. I always like to provide the best possible product and unless you do the job from the very beginning there is no way to know what was done before you. This doesn’t happen often to us but this is how we deal with these situations.

For the bottom half of the install we started using the Noce and Ivory Tumbled 4×4’s in straight lay. We got about 125sqft. up the first couple days and the Homeowner was having a problem with the two tiles being so much different. We left that day letting her get a feel for it and if the tile was going to work or not. Later that day I received a call that no setter likes to get. “Chad we’re going to change everything to Ivory instead.” Let me say that I honestly don’t mind these things since my main goal is a satisfied customer. So the next day we had a meeting of the minds to figure out the best way to tear out every other tile and eventually found a way that worked very well. As you can see by the pictures it was an event to say the least. But with a positive attitude we got a positive outcome.

Once all of the Noce tiles had been tore out we started re-tiling the spots with the new Ivory tile that we had ordered. We continued on and tiled the liner and the upper sections on a diagonal. Once all the tile had been set and had been given time to dry it was time to grout.

The homeowner was going for a French Country look and said that in that style designers use a lot of white grout. So she and I went over grout color samples and decided on Custom Building Products Snow White. At first I wasn’t too sure on that color so I did a sample board to show her and so I could see it also. Come to find out that I really like the Snow White with the Ivory I think it looks great and so did she. Now that the grout had been picked we went ahead and grouted up the whole job and left it for a couple days to dry. After the two days was up we came back and used an Enhancing Sealer on the stone and the grout to really bring out the richness of the tile job. A few more finishing touches and we were done.

This was such a great job for me to do. I can’t wait to hear what Frank says about it when he gets home. Although I’m pretty sure this shower will have to be a close second to seeing his loving wife….

12×12 Ankara Tumbled Stone Kerdi Shower in Murrieta

On this project Chad Deiter Company had already met with the homeowners and got an idea of the materials that they wanted to use for their master shower project. They had recently seen the Slate Rimini Pattern at Arizona Tile in San Marcos, CA and loved it. I suggested the 12×12 Ankara Tumbled Marble to match the existing marble flooring. After a few days went by and  everything was picked out. I made the computer rendering for the job with the 12×12 tumble stone for the shower walls and a liner in the shower, tub splash and counter top backsplash.

Being that this was going to be a Schluter Kerdi Shower the first step was having the existing shower walls tore out all the way down to the studs. After that was finished I came in and started laying out the shower and the inset niche. Knowing that the liner had a 4” row of the Rimini and a Rope Liner on top I knew that the total was 5”. So I framed in the inset niche so it would be right under the liner just like I wanted it to be. Here at Chad Deiter Construction we pride ourselves on shower layout and incorporate the Golden Ratio to make that our showers are appealing to the eye.

Once all of the framing had been shimmed and planed flat we dry walled the shower and began installing the Kerdi Shower Kit from Schluter.  I’ve said this before but this system is one of my top rated as far as shower waterproofing systems go. I really like the fact that the waterproofing is directly behind the tile as opposed to the older ways where the waterproofing is behind a mud floated wall. We still float some showers but it depends on the budget of the project and the tile selection.

With the Kerdi Shower Kit installed we were ready to start tiling. One other plus to this system is that tile can be installed right away no need to wait the 24 hours like some of the other waterproofing systems that are available. When I had figured out the tile I knew that I had to have full tile on the tub deck from the outside corner both down and inside. So that was the control to how the tile was going to layout. I went ahead and started setting the Tumbled Stone (very popular here in the Temecula Valley )with Laticrete 252 thin set. Starting on the back shower wall and working my way around and up to the liner. Once the field tile was set up to the desired height it was leveled and the Tumbled Slate Rimini and Rope liner was installed. This liner had to dry overnight and the next day we could finish the last two rows of the shower walls. As you can see by the picture’s the niche ended up right where it should be and is very functional and clean.

The shower pan was fairly straight forward since the Slate Rimini is on 12×12 sheets and the Kerdi Drain had a 4” grate on it there’s not much you can change with the shower pan layout. That was tiled and grouted prior to the very bottom wall tiles to be installed.

After all the tile has been installed and had set overnight we grouted the shower walls and shower pan with Custom Building Products Linen Sanded grout. The grout color had already been decided by the homeowner’s and the designer over at Arizona Tile in San Marcos,CA.

After the grouted shower had dried out for a couple days it was time to seal the Tumbled Stone and grout. I prefer the Miracle Sealants 511 sealer. I use both their regular sealers and enhancing sealers.

Chad Deiter Company on Temecula Construction Looking Up

Well in Chad Deiter Company’s opinion of the first two months of 2010 business is picking up. At least in Temecula,CA it is but I have also had some good calls from Huntington Beach, Laguna Beach. Not too much in the way of new construction mostly kitchen and bath remodels. These are fine with me the average master remodel takes me a little over 2 weeks once all the tile is in so I can get started.

I have been using the Kerdi Shower System and also the Laticrete Hydroban over mud bed lately for my showers depending on the budget for the project.

Super Bowl Sunday

Well the Super Bowl of 2010 is here and it’s the Saints and the Colts. I’m kind of leaning toward that Saints just because I still think the Chargers should have kept Brees. Sad thing is because I am dedicated to my customer’s and to my Projects I will be working on Sunday because of a deadline that we have. But hopefully will make it in time to see some of the game.

So for those that will be partaking in some Super Bowl Parties please be safe and don’t drink and drive. My family will be on the road as well as many others.

Chad